一、 大梁货架方案说明
图示为货架方案构想图草案,初步设计尺寸为21600*8200*2400,悬臂长1400mm。此货架悬臂较长,货物堆码高,存放物较重(50.4T),确保存取安全和作业方便为货架设计之首要条件,我们咨询了国内数家专业知名的物流设备供应商,目前还未找到较完善的方案,草图方案仅适合存放直通梁,但折弯梁的存取便利及安全性还需另行研讨,设计。
甲方需对存放架地坪作特别处理,货架配备专用堆垛行车由甲方负责(行程高度确保,带叉臂,不需另作吊具),为确保存取安全每层堆垛建议作安全带捆扎处理(冲压完成后)。存放区作特别安全警戒线,严禁非作业者进入。
1.side member storage shelf
the map show that draft of storage shleve, preliminary design dimensions: 21600*8200*2400, length cantilever beam 1400mm. This cantilever beam longer,pile higher,deposit heavier(50.4T),the design of storage shelve must be sure that it is safe for access security and convenient operation.we asked some logistics equipment suppliers,but haven’t a better programme.Draft options only for direct type beam, we need to studying and designing about
the stacking crane to shore and get out the materials of bended side member.
first party need to do some special treatment for storage shleve floor, By first party responsible for stowing travelling crane(ensure highly trip,fork arm,no hanger). Storage areas for special security cordon,no enter without permission.

二、 转运平板车方案
规划数量计24台,12套,平板车初步尺寸为2800*400*400,车轮选用特殊类别,中间为铸铁外包优力胶,每个车轮设计承重2T。按生产纲领计算生产使用中8套,搬运作业中1套,预存放3套,共计12套。每台车配备牵引挂钩。甲方配备牵引车头及与平板车相连的牵引连拉杆。
2.Transferring trailing bar trolley
Planning number 24,12sets, dimensions: 2800*400*400,the wheel used Special categories, Bearing 2T per wheel.on proction Programme that used 8sets in process,1 set in handling operations,3 sets deposit,amount 12 sets. Each vehicle equipped with traction link.

三、 大梁从零工位上一工位方案
大梁由牵引车头拖至零工位后,车头返回,平板车停在零工位,由于质量重需由动力牵引至一号工位,规划方案为采用电动马达带绞盘机构,配置钢绳(前端有挂钩)挂在平板车上开动马达拖至一工位,行程距离约为15m,运行时蜂鸣警示器启动。地表设限位块,马达、绞盘需地沟预埋工程。
3.project from workstation 0 to workstation 1
After side member to workstation 0 by towing power,front back,stop in workstation 0, As required by the heavy traction power to workstation 1, the plan for the introction of electric motors with winch, configuration Steel (linked to a front-end) pegged to the starting motor in the flatbed truck towed to a public place. Trip distance of about 15 m.

四、 第一工位平面图说明
纵梁上夹具左右共配置两套吊挂系统,纵轨、横轨采用国内浙南品牌,起吊葫芦采用DEMAG,悬挂风动工具、电钻用KBK轨道,浙南平衡器。由一工位至二工位配置2T葫芦(国内品牌),配置专用搬送吊具(乙方制作)。夹具为可调节式,对应不同车种夹持定位作业,夹具可翻转90°
4.Ichnography workstation 1
Hanging system have collocated by L/R jig on side member, Lifting hoist used DEMAG, Hoisted pneumatic tools. Configuration 2T hyacinth (domestic brands)by workstation 1 to workstation 2, Dedicated to feed the spreader configuration (B proction),jig adjustable, overturned.

五、 车架第二工位平面示意图说明
车架总拚夹具满足不同宽度和不同腹高的车架装配,不同轴距支承可调,在后轴车种切换采用滑动手动定位,中间梁装配配置中间梁台车共9台。工具吊挂轨道采用KBK,大梁总成搬送配一套2T葫芦(国产),和乙方自制专用吊具,轨道采用浙南牌。在平衡轴、中间梁存放区配置工字钢构(国产或浙南),葫芦选用DEMAG。
5.Frame ichnography workstation 2
Fixture satisfy the needs of different widths and different abdominal high frame assembly, supporting different adjustable wheelbase,manually positioning by rear axle vehicles switch.9 sets middle member. KBK orbit using tools hanging.

热心网友 时间:2023-09-04 20:44

Craft plan schematic drawing explanation
First, summer beam shelf program narrative
The graphical representation for the shelf plan conception chart draft, the preliminary design size is 21600*8200*2400, hangs reach 1400mm. This shelf bracket is long, the cargo piles the code to be high, depositing heavy (50.4T), guaranteed that deposit security and work convenience for shelf design first condition, we have consulted the domestic several specialized well-known physical distribution equipment supplier, at present had not found the perfect plan, the schematic diagram plan only suits depositing to go nonstop to Liang, but folds the camber beam the deposit convenience and the security also needs the separate deliberation, design.
The first party must to deposit grounds around a house to do processes specially, the shelf provides special-purpose piles up the driving to be responsible for (traveling schele by the first party guarantee highly, brings fork arm, cannot make hoisting mechanisms in addition), to guarantee that the deposit safe each level piles up suggested after making the safety belt to tie up processing (ramming to complete). The depositing area makes the special security warning line, refuses the non-work to enter
Second, transportation flatbed plan
Plan number gauge 24, 12 sets, the flatbed preliminary size is 2800*400*400, the wheel selects the special category, middle for cast iron outsourcing superior strength rubber, each wheel design load-bearing 2T. According to the proction guiding principle computation proction use in 8 sets, transport in the work 1 set, deposits 3 set in advance, total 12 sets. Each trolley equipment tows the suspension hook. The first party equipment tows the front and with the flatbed connected hauling continually tension bar.
Third, summer beam from zero location a location plan
The summer beam by tows the front tows after zero location, the front returns, the flatbed stops in zero location, because the quality heavy must by the power traction to the first location, the plan plan to use the electrically operated motor belt capstan organization, the disposition steel cable (front end has suspension hook) to hang when the flatbed starts the motor to tow to a location, the traveling schele is away from approximately is 15m, the movement the buzzing caution start. The surface supposes the spacing block, the motor, the capstan needs the trench to bury the project in advance.
Fourth, the first location horizontal plan shows
On the carline about the jig altogether disposes two sets to hang the system, the vertical axle, the cross rail use the domestic South Chekiang brand, the hoisting up bottle gourd use DEMAG, the hand pneumatic tool, the electric drill use the KBK track, the South Chekiang balancer.Disposes the 2T bottle gourd by a location to two locations (domestic brand), the disposition special-purpose moves delivers the hoisting mechanisms (second party to manufacture).The jig for may adjust the type, corresponds does not take the same bus to plant the clamp localization work, the jig may turn over 90°
Fifth, frame second location plane schematic drawing explanation
The frame always struggles the jig to satisfy the different width and the different abdomen high frame assembly, different spread of axies supporting adjustable, plants the cut in the hind axle vehicle to use the glide manual localization, intermediate girder assembly disposition intermediate girder trolley altogether 9. The tool hangs the track to use KBK, the summer beam unit moves delivers matches a set of 2T bottle gourd (domestic proct), with the second party self-restraint special-purpose hoisting mechanisms, the track uses the South Chekiang sign. In the staff, the intermediate girder depositing area disposition I-steel construction (domestic proct or South Chekiang), the bottle gourd selects DEMAG.

热心网友 时间:2023-09-04 20:44

这个肯定对的,机器翻译,

First, the girder shelf programme
Icon shelf options and ideas for the draft plans, preliminary design size of 21600 * 8200 * 2400, 1400 mm long cantilever. This cantilever shelves longer, cargo stacking, storage of heavier (50.4 T), to ensure access to safe and convenient operation for the primary design of the shelves, we have consulted with a number of professional well-known domestic logistics equipment suppliers, has yet to find a better programme, the draft programme for storage only through beam, but bending beam convenience and safety of access needed further study and design.
Party A to the need for storage-Ping for special treatment, special stacking shelves with the owner responsible for the traffic (to ensure a high degree of itinerary, with wishbone without a separate spreader), in order to ensure access to safe stacking library proposal Banding seat belts for processing (after the completion of stamping). Storage areas for special security cordon, is prohibited from entering non-operational.
Second, transit flatbed truck programme
Planning volume in the 24, 12 sets, flatbed truck initial size of 2800 * 400 * 400 and the wheels of a special category selection, with a gifted cast iron outsourcing of plastic, each wheel bearing design T 2. Proction Programme calculated by the use of the eight sets of proction, handling operations in one set, three sets of pre-stored a total of 12 sets. Each vehicle equipped with traction link. Party A tractor equipped with the first flatbed truck and connected with the traction even drawbars.
Third, from the chore of girders on a programme of work
Beam from the first tractor-towed chore, to return to the front, flatbed truck parked in the chore of, as required by the re-quality dynamic traction to the place on the 1st, the plan for the introction of electric motors with winch, configuration Steel (linked to a front-end) pegged in the flatbed truck on the running of the motor towed to a journey distance of about 15 m, running Fengming warning device is switched. Limit surface located blocks, motors, winch to Trench embedded projects.
4, the first-floor plan that
Beam fixture on the total allocation of about two sets of hanging systems, vertical track, cross country track used brand of southern Zhejiang, lifting hoist used DEMAG, hanging风动工具, electric drills with KBK track, southern Zhejiang Balancer. From the one-to two-position Configuration 2 T hyacinth (domestic brands), dedicated to feed the spreader configuration (B proction). Fixture for an adjustable, clamping with different kinds of vehicles operating position, can be overturned 90 ° Fixture
5, the second frame diagram of the plane
Frame the fight fixture satisfy the needs of different widths and different abdominal high frame assembly, supporting different adjustable wheelbase, rear axle vehicles in the use of a sliding switch manually positioning, beam assembly middle-beam configuration among a total of nine vehicles. KBK orbit by hanging tools, girder assembly moved Songpei a 2 T hyacinth (domestic), and B for self-Sling, a track south of Zhejiang licensing. Benghengzhou in the middle beam storage area configuration I-beam structure (domestic or southern Zhejiang), gourd selection DEMAG.

热心网友 时间:2023-09-04 20:45

The craft plan schematic drawing showed that one, summer beam shelf program narrative the graphical representation for the shelf plan conception chart draft, the preliminary design size is 21600*8200*2400, hangs reach 1400mm. This shelf bracket is long, the cargo piles the code to be high, depositing heavy (50.4T), guaranteed that deposit security and work convenience for shelf design first condition, we have consulted the domestic several specialized well-known physical distribution equipment supplier, at present had not found the perfect plan, the schematic diagram plan only suits depositing to go nonstop to Liang, but folds the camber beam the deposit convenience and the security also needs the separate deliberation, design. the first party must to deposit grounds around a house to do processes specially, the shelf provides special-purpose piles up the driving to be responsible for (traveling schele by the first party guarantee highly, brings fork arm, cannot make hoisting mechanisms in addition), to guarantee that the deposit safe each level piles up suggested after making the safety belt to tie up processing (ramming to complete). The depositing area makes the special security warning line, refuses the non-work to enter. two, transportation flatbed plan plan number gauge 24, 12 sets, the flatbed preliminary size is 2800*400*400, the wheel selects the special category, middle for cast iron outsourcing superior strength rubber, each wheel design load-bearing 2T. According to the proction guiding principle computation proction use in 8 sets, transport in the work 1 set, deposits 3 set in advance, total 12 sets. Each trolley equipment tows the suspension hook. The first party equipment tows the front and with the flatbed connected hauling continually tension bar. the three, summer beams from zero location location plan the summer beam by tows the front tows after zero location, the front returns, the flatbed stops in zero location, because the quality heavy must by the power traction to the first location, the plan plan to use the electrically operated motor belt capstan organization, the disposition steel cable (front end has suspension hook) to hang when the flatbed starts the motor to tow to a location, the traveling schele is away from approximately is 15m, the movement the buzzing caution start. The surface supposes the spacing block, the motor, the capstan needs the trench to bury the project in advance. the four, first location horizontal plans showed that on the carline about the jig altogether disposes two sets to hang the system, the vertical axle, the cross rail use the domestic South Chekiang brand, the hoisting up bottle gourd use DEMAG, is hanging the pneumatic tool, the electric drill to use the KBK track, the South Chekiang balancer. Disposes the 2T bottle gourd by location to two locations (domestic brand), the disposition special-purpose moves delivers the hoisting mechanisms (the second party manufacture). The jig for may the adjustment type, correspond does not take the same bus to plant the clamp localization work, the jig may turn over 90° the five, frame second location plane schematic drawing to explain that the frame always struggles the jig to satisfy the different width and the different abdomen high frame assembly, different spread of axies supporting adjustable, plants the cut in the hind axle vehicle to use the glide manual localization, intermediate girder assembly disposition intermediate girder trolley altogether 9. The tool hangs the track to use KBK, the summer beam unit moves delivers matches a set of 2T bottle gourd (domestic proct), with the second party self-restraint special-purpose hoisting mechanisms, the track uses the South Chekiang sign. In the staff, the intermediate girder depositing area disposition I-steel construction (domestic proct or South Chekiang), the bottle gourd selects DEMAG.

热心网友 时间:2023-09-04 20:45

The sketch map elucidation of the craft project

A, the project elucidation of the crossbeam shelf
The diagram shows for the shelf project speculation diagram drafted plan, the first step designs the size as 21600*8200*2400, hang arm to grow a 1400 mms.This shelf hangs arm longer, goods heap the code is high, depositing a thing more heavy(50.4 Ts), insure the access safety and homework convenience as the initial condition of[with] shelf design, we consulted with a local several professional well-known logistics equipments supplier, haven't found out a more perfect project so far, grass diagram project only in keeping with deposit to keep a beam, but fold curved access convenience and safety of beam still need an another line to study and discuss, design.
The first party needs to make a special processing towards depositing a ground ping, shelf equipment appropriation heap the go the first party is responsible for car, for insure to access a safe and each heap suggestion to make safety belt to tie~up a firm processing.(blunt press completion behind)Depositing the area makes specially safe and warnning line, strictly forbiding non- homework into.
Two, the transport flat panel car project
The programming amount accounts 24 sets, 12 set, the flat panel car initial size is 2800*400*400, the car wheel chooses to use a special category, wrapping excellent dint gum outside for the iron casting in the center, each car wheel design accepts a heavy 2 Ts.The outline calculation of pressing the proction proces usage win 8 set, transport 1 set in the homework, prepare to deposit 3 sets, add up to 12 sets.The trolley equipment leads a hook each time.The first party provides with to lead a car head and connects with each other with flat panel car of lead to connect to pull a pole.
Three, the crossbeam is from the odd jabs a last project
Crossbeam from after leading a car head to drag along to the odd jabs, the car head returns, the flat panel car parks an odd jabs, because of quality heavy need is led by the motive to the No.1 work, program in order to adopt electric motor to take capstan organization, the project installs a steel rope(the head have a hook) to hang on the flat panel car to start motor to drag along to 1, the route of travel distance invites for the 15 ms, circulate hour the caution machine start.The earth's surface establishes a limit piece, the motor, capstan needs a ground of ditch to prepare to cover up engineering.
Four, the first work plane chart elucidation
The tongs is or so to install 2 sets to mourn to hang system totally on the beam, the track, horizontal track adopts local south brand, rising to mourn bottle gourd adoption DEMAG, hanging breeze to begin to work a , electric drill to use KBK orbit, the south equilibrium machine.It is gone to 2 by 1 to install 2 T bottle gourd(local brand), install appropriation to move to send to mourn.(the second party create)The tongs is an adjustable stanza type, to clip in response to the different type of car hold fixed position homework, tongs inside out 90 °s
Five, car the second work the flat surface sketch map explain
The car always works hard for tongs to satisfy different width and different stomach a high car assemble, the different stalk is apart from to accept adjustable, at after the stalk type of car cut over adoption glide to move a fixed position, in the center the beam assemble install in the center the beam trolley is total 9 setses.The tool mourns to hang orbit adoption KBK, the crossbeam always becomes to move to send to go together with a set of 2 T bottle gourd(domestic), self-making appropriation to mourn with the second party, orbit adoption the south card.In the equilibrium stalk and in the center the beam deposit area to install the work word steel (national proct or south), the bottle gourd chooses to use DEMAG.

热心网友 时间:2023-09-04 20:46

翻译这么长200分?估计你给1000会有人给你一个字一个字的翻
声明:本网页内容为用户发布,旨在传播知识,不代表本网认同其观点,若有侵权等问题请及时与本网联系,我们将在第一时间删除处理。
E-MAIL:11247931@qq.com